Jinko Solar-动态详情

  • 金年会·(中国)金字招牌,信誉至上

    Este site usa cookies para melhorar a experiência do usuário. Ao usar nosso site, você concorda com todos os cookies de acordo com nossa Política de Cookies.

    Accept
    Investor Relations
    English

    SHANGHAI, September 19, 2011 / -- JinkoSolar Holding Co., Ltd. (“JinkoSolar” or the “Company") (NYSE: JKS), a fast-growing, vertically-integrated PV manufacturer with production facilities in China, today addressed environmental concerns related to its facility in Haining city, Zhejiang Province, China. Recent reports indicate that Zhejiang Jinko Co., Ltd. (“Zhejiang Jinko”), a subsidiary of JinkoSolar, discharged a small amount of solid waste containing fluoride into a nearby brook. In response to the concerns of local residents and in full cooperation with the local government’s investigation, Zhejiang Jinko has temporarily suspended production at its facility in Haining until the impact of any possible environmental damage has been assessed and remedied. An initial investigation conducted by the local environmental protection authority indicates that the issue may have been caused by the company’s transitory storage of waste as it sought a new waste management contactor to comply with the environmental authority’s latest policy. During this time, unexpected and extreme rain conditions may have caused a small amount of waste containing fluoride to flow into the nearby brook via the factory’s drainage system. This unfortunate incident has greatly impacted the management team of JinkoSolar. The Company takes pride in its environmental compliances, and has met or exceeded all requirements for ISO 14001 certification. Additionally, JinkoSolar ensures that all its factories are equipped with state of the art machines designed for minimal environmental impact. The Company’s investigation team is carrying out an in-depth examination of the Zhejiang factory to identify the root cause of the incident and is also seeking a third party agency to conduct joint investigations.  The halt in production is not expected to have material impact on JinkoSolar’s operations and module delivery commitment to its customers. JinkoSolar’s main factory in Shangrao, Jiangxi, is in full operation and has enough stocks to keep producing and meet customer demands. The Company will update the market as the situation evolves.

    Legal Statement

     
    All rights reserved © 2020 Jinko Solar. 沪ICP备2022022315号-1. Privacy Policy. Powered by Webfoss.
    友情链接: